Jan 10, 2008

CMMI V1.2: What Has Changed and Why

This article provides a view of what has been included – and not included – in Capability Maturity Model®Integration Version 1.2 (CMMI®V1.2) for CMMI users who are familiar with the products. CMMI V1.2 products, including CMMI for Development, V1.2 (the model),

Standard CMMI Appraisal Method for Process Improvement (SCAMPISM), V1.2 (the appraisal method), and Introduction to CMMI, V1.2 (the training), was released on August 25, 2006. I describe the major elements of change for each of these CMMI products.

Draft V1.2 products were approved, piloted, and revised to ensure that the proposed changes actually improved the quality of the model, method, and training materials – and did no harm to existing improvement efforts and investments already made by those who used CMMI V1.1. I also seek to add some idea of why many of these changes were made.

http://www.stsc.hill.af.mil/crosstalk/2007/02/0702Phillips.html

No comments: